Quinnesec Falls Day Ten

29 APR 2020 – Diorama Infrastructure Considerations The diorama will mainly consist of The base which will include the Menominee River downstream from the falls and supporting scenery including two bridges. The slope which will include the most turbulent part of the falls and rocks and trees to the mill side of the falls. TheContinue reading “Quinnesec Falls Day Ten”

Quinnesec Falls Day Four

22 APR 2020 – Designing the Removable Diorama Challenges The diorama will be shaped asymmetrically. The diorama will be heavy and awkward.  It may not be evenly balanced Solutions The base must be narrower than the top to ensure removal and replacement does not damage surrounding scenery and structures The diorama will be built withContinue reading “Quinnesec Falls Day Four”

Little Quinnesec Falls Day Two

20 APR 2020 – Today’s project was to remove the impediments to working on the water feature for Little Quinnesec Falls and the hydro electric power plant there. I did some fiddling with parts in my extra parts box to determine how the actual scratch built buildings might go together, but that will be aContinue reading “Little Quinnesec Falls Day Two”

Design a site like this with WordPress.com
Get started