Quinnesec Falls Day Four

22 APR 2020 – Designing the Removable Diorama Challenges The diorama will be shaped asymmetrically. The diorama will be heavy and awkward.  It may not be evenly balanced Solutions The base must be narrower than the top to ensure removal and replacement does not damage surrounding scenery and structures The diorama will be built withContinue reading “Quinnesec Falls Day Four”

Little Quinnesec Falls Day Two

20 APR 2020 – Today’s project was to remove the impediments to working on the water feature for Little Quinnesec Falls and the hydro electric power plant there. I did some fiddling with parts in my extra parts box to determine how the actual scratch built buildings might go together, but that will be aContinue reading “Little Quinnesec Falls Day Two”

Little Quinnesec Falls Project – Day One

19 APR 2020 – Through a series a of blog posts, I hope to bring everyone up to speed on how I got here. Suffice it to say, the layout is about 30% complete and during the Covid-19 Pandemic I decided it was time to work on a water feature. The plan is to buildContinue reading “Little Quinnesec Falls Project – Day One”

Design a site like this with WordPress.com
Get started